Skip to content
The permanent exhibition is being created and will open to the public in stages.
Satu Mare · Szatmárnémeti

Museum · Satu Mare

About

The project was initiated by the Municipality of Satu Mare to raise the city’s tourist potential by creating a new attraction of local and regional interest — a museum centre distinct from those existing in the city and the region, built to the newest standards in the field, using interactive methods and digital technologies to offer a unique experience and to ensure access to culture and education for everyone, regardless of location or background.

Through this regionally unique project, a multifunctional space is being created which will place Satu Mare on the map of thematic museums, while the local community gains an inspiring communal space — through knowledge of the past and everyday use of the space.

The museum’s components

  • Permanent exhibition

    A generous space with authentic period décor and objects: the stages and main themes of the communist period, through a unique combination of old equipment and digital technology — with a general section on communism, the Revolution and the 1990s.

  • Thematic exhibitions

    A multifunctional space for thematic exhibitions and events — an architecture biennale, conferences and workshops — covering the communist and post-1989 periods.

  • Community spaces

    Spaces returned to the citizens, especially the young, for educational, cultural and thematic activities: art, music, literature and more.

Works executed to date

  • the building’s and terrace’s structural frames
  • perimeter enclosures
  • roofing
  • the electrical, sanitary and heating installations

Project financed through the NRRP (PNRR)

The project
„Muzeul industrializării forțate și al dezrădăcinării - Satu Mare” (The Museum of Forced Industrialization and Uprooting – Satu Mare)
Financing
PNRR · Component C11 – Tourism and Culture · Investment I2
Beneficiary
The Municipality of Satu Mare
Total value
RON 38,007,725.08 (VAT included)
Eligible value
RON 24,609,512.62 (VAT included)
Completion date
31 August 2026